Extension of the building belonging to the modern classic to the garden, conversion of the entire ground floor, replacement and modernization of the plant technology
1005.architektur
Working phases 2-8
Demolition of the winter garden and expansion of the house (built in 1926) with a year-round usable extension opening onto the garden. The owners and residents wished to plan the extension seamlessly and create an extension that blends seamlessly with the existing building. The ground floor will be reorganized in this context, and the family's focal point will be relocated to the garden side, in accordance with the wishes of the family of five.
- Year
- 2025
- Location
- Potsdam / Bablesberg
- Status
- completion 2026